Projects
These are our running projects that I am working on. I might document them when actually doing them , but I want to put them down so I dont loose track
- Install pump for Aircon (pump is bought and has arrived) – Done , Aircon tested and working (5-2017)
- Install pump for Watermaker (pump is bought and has arrived)
- replace defective RL70C plotter for E120w and connect it up through STNG / NMEA2000 backbone network and ethernet
- Install Raymarine E90W in navigation table and connect to STNG / NMEA2000 backbone network and ethernet
- Install washing machine (yes really !! , found wonderful wallmount washing machine and it needs to go into the aft head on the wall)
- replace anodes on the keel cooler = Done
- replace anode on the prop shaft = Done
- clean heat exchanger
- putting watermaker together and get it up and running